Widening Floating Dock RW-2 at Reimerswaal shipyard
In Sept./Okt. 2011 Navikon performed a unique work consisting of widening of the existing Floating Dock for 6 meters, done 100% in afloat condition!!!
In inclined dock position new sponsons have been installed to the the dock-pontoon sides of and aftrewards dock walls have been shiffted aside and welded in new locations.
Congratulations to Reimerswaal shipyard which possess now a new tool for drydocking of ships.





